Entering time-phased data

Display table of contents

Planning Procedure >

Entering time-phased data

All time-phased data are entered in the white lines either on the individual resource level or – for several resources simultaneously – in the details table.
Rows with a gray background contain automatically transferred or calculated values. As the aggregation of values at team level is automatic, the rows at this level are gray.


➤ You can enter time-phased data after a single or double click in a cell.


Entering data on the individual resource level

▪Expand a resource field (here: Sally) and go to to the row of the item for which you want to allocate time (here: Absences > Vacation).

▪Insert the number of hours in the respective cells of the timeline.

EnteringTimePhasedData_1

For periodic activities, you can enter the same value for many subsequent time phases by drag and drop:

▪Enter the value in the first cell of the period and drag the bottom right corner of the cell to the right.

EnteringTimePhasedData_2

                                                  ArrowDown

EnteringTimePhasedData_3

Entering data in the details table

▪At the team level, expand the item for which you want to allocate time and select a category (here: Absences > Vacation).

▪Select Details in the Views group of the menu bar.
The respective rows of the team members will be shown in the details table.

EnteringTimePhasedData_4

In the details table, you can enter the same value for many subsequent time phases and/or several resources by drag and drop:

▪Enter the value in the first cell.

▪Drag the bottom right corner of the cell vertically or horizontally to copy the values. Drop the corner and then drag it to the other direction.

EnteringTimePhasedData_5

 

EnteringTimePhasedData_6

                                                        ArrowDown

EnteringTimePhasedData_7