When hovering over a Gantt bar, the tooltip displayed an incorrect project duration.

The issue was caused by calendar data not being loaded, which led to durations being calculated using a 24‑hour default day instead of the intended 8‑hour workday calendar.
This bug has been fixed: The tooltip now correctly shows the project’s actual duration.