Changing the timeline size in the Scheduler now correctly adjusts both the timeline area and the height of the Gantt bars.
Previously, switching to Small, Medium, or Large only resized the timeline panel above the Gantt chart, while the bars themselves remained unchanged.
The zoom levels now behave as expected and consistently scale both the timeline and the bar display.