When a new Scheduler channel is created in Microsoft Teams, a Project Status Report tab is now automatically added to the channel.
The tab displays a Power BI report filtered to the current project, providing team members with direct access to project status information from within Teams. The report configuration is based on the existing Power BI report settings and is created automatically during channel provisioning.
This enhancement helps improve visibility into project status and reduces the manual effort required to configure Teams channels for new projects.
▶ This feature currently creates only the Power BI report tab. Direct integration of a Dynamics 365 project details tab is not included.