Bug Fix: Availability Factor not selected correctly

Display table of contents

PPP Scheduler Changes >

Bug Fix: Availability Factor not selected correctly

The 102a - Capacity per Month flow now selects the correct availability factor from the configuration.

A condition in the flow that checks the availability factor was corrected.