PPP Scheduler Changes > Scheduler App > See Resource Availability in Timephased Tooltip |
Resource availability insights are now available directly in Scheduler tooltips. When hovering over a timephased cell, you can instantly see how much capacity a resource has available and how much work is already allocated for the selected period.
Availability details in tooltips help you evaluate resource capacity without leaving the Resource Utilization view.
Tooltips now display:
▪Availability for the selected period
▪Other work assigned to the resource during the same period
Available values are shown for both:
▪Individual assignment rows
▪Aggregated resource rows
Information is formatted consistently with Advanced Grid, including:
▪Localized labels
▪Two-decimal precision
▪Support for both absolute values (hours/days) and percentage-based availability
Tooltips automatically update when project data or the current zoom level changes.
Improved planning experience
Resource availability information is displayed directly where scheduling decisions are made.
Benefits include:
▪Quick identification of potential overallocation risks without switching views
▪Immediate visibility into remaining capacity and competing workload
▪Faster planning and decision-making
Tooltip calculations use cached allocation data to provide a smooth, responsive user experience, even in large projects.
Missing availability information is handled gracefully by displaying N/A where appropriate.
This enhancement brings Advanced Grid availability insights into the Scheduler Resource Utilization view, giving project managers immediate visibility into remaining resource capacity and competing workload while planning assignments.